Description of Project: The Owl’s Head Wastewater Resource Recovery Facility is located at 6700 Shore Rd in Bay Ridge Brooklyn, NY and treats approximately 95 MGD of waste on an average annual basis. The work under this Contract includes an upgrade of the existing Main Substation No. 1, installation of new power infrastructure (including transformers, switchgear, service feeds etc), sitework such as building and flatwork demolition as well as surface restoration, and other general exterior improvements. The Main Substation construction includes a secant pile support of excavation system, concrete substructure, steel framing, architectural finishes, a fire alarm system, HVAC etc. Many bidding opportunities available.