Listed below is the work to be done, with noted deleted areas, under Item 641.510XYZ16. The required maintenance and protection of traffic and pedestrians for each bridge is included in the “Work Zone Traffic Control” notes and the “Schedule and Suspension of Work” contained in this Proposal. Off peak, nighttime and weekend work periods will be necessary to complete the work. The Contractor is advised that some of the bridges may have under bridge utility pipes/conduits and under bridge lighting fixtures. Caution is to be used when cleaning near the pipes/conduits and fixtures to avoid damage to these installations. M.P. NE 0.23 – Thruway over Bronx-Pelham Parkway ♦ Clean per specification. ♦ Bridle Path traffic shall be maintained during cleaning operation. M.P. NE 0.24 – Pedestrian Bridge over Bronx-Pelham Parkway ♦ Clean per specification. ♦ Pedestrian traffic shall be maintained during cleaning operations. ♦ Bridle Path traffic shall be maintained during cleaning operation. M.P. NE 0.41 – Thruway over Amtrak RR & Erskine Place ♦ Clean per specification. ♦ Delete cleaning of the fascia, underside of the deck, outside of the fascia beams and any other structural steel on the span over Amtrak. ♦ Pedestrian traffic shall be maintained during cleaning operations...