Work under this item shall include all activities necessary to replace the water service line from the curb stop or reconnection point indicated on the Contract Drawings to the meter (on private property). Newly installed 1” dia. Polyethylene water service includes connection to the curb stop and costs associated with the excavation, jacking, or missiling of service under all pavements, sidewalks, and landscaping from the curb stop to the exterior face of the property owner residence and site restoration. The work shall also include extending the service through and into the owner residence, and furnishing and installing a new pressure regulator, new check valve, and new angle meter valve, and interior plumbing adaptions to reconnect the replacement service to the existing meter. The existing service and meter shall also be flushed and purged of water prior to reconnecting to the new service.