A. Program Work shall be limited to designated rehabilitation and renovation construction contracts bid and let by the Agency (or its Construction Manager where applicable) after the effective date of this Agreement with respect to rehabilitation and renovation work performed for the Agency on City-owned property under contracts advertised for public solicitation prior to December 31, 2024. Subject to the foregoing, and the exclusions below, such Program Work shall mean any and all contracts that predominantly involve the renovation, alteration, repair, rehabilitation or expansion of an existing City-owned building or structure at a Wastewater Resource Recovery Facility, a water filtration plant, or a pumping station within the five boroughs of New York City. Examples of Program Work include, but are not limited to, the renovation, repair, alteration and rehabilitation of an existing temporary or permanent structure, or an expansion of above ground structures located in the City on a City-owned building. Program Work shall also include job order contracts (“JOCS”), demolition work, painting services. Low voltage work, site work, elevator work, mold, asbestos and lead abatement, carpentry services, and carpet removal and installation shall be included as Program Work only when incidental to such building renovation and/or rehabilitation of City-owned buildings or structures and included in a contract that predominantly involves such renovation and/or rehabilitation. Program Work shall also include the installing and removing of centrifuges on City-owned property, but not any other work under such contracts, in connection with contracts that involve the maintenance or repair of centrifuges, in accordance with Exhibit “E”. Program Work shall also include contracts bid and let by the Agency for the rehabilitation and upgrade of wells and well stations located in Southeast Queens as part of the Queens Groundwater Project, including the construction of new buildings and other above or below-ground structures, the installation of equipment, piping and drainage structures including subsurface installations, the installation of water treatment system elements, control systems, plumbing, electrical, HVAC and site and road work required for the construction, operation or maintenance of the wells and other related facilities.