The installation of one (1) Generac RG02515ANAX genset, one (1) Automatic Transfer Switch RXSW200A3, and all materials involved in making equipment operate per manufactures specifications. All equipment, materials, fasteners, and hardware necessary to complete the installation will be provided by Wyoming County Buildings and Grounds. Details to be discussed during site visit. Contractor is to provide all Labor costs for the construction and connection of all materials necessary for the Generator and transfer equipment to operate properly per the manufacture’s specs. Installation of Gas line not to be included, County workforce to install gas line. All work to meet or exceed all Building and Electrical codes. Per NYSDOL Article 8 all Labor is to be Prevailing wage per PRC # 2024-012801 All contractors must be registered with NYS DOL per Labor Law Section 220-I before submitting proposal. Contractor registration certificates must be included in proposal to be considered. Work to be conducted Monday – Friday between 7am and 3pm.