1. Site Assessment and Planning $ 2. Structural $ 3. Plumbing $ 4. Electrical $ 5. HVAC $ 6. Insulation and Drywall $ 7. Flooring $ 8. Appliances, Lighting, and Hardware $ 9. Painting $ 10. New Front Entry Door $ 11. Laundromat Flooring $. 1 Site Assessment and Planning $ Conduct a detailed site survey to verify dimensions and conditions, using Owner provided floor plan sketch. Bedroom to be located in the northeast corner, 9’x14’ with a 32” door. Bathroom to be located in the southwest corner, 9’x5’6” with a 30” door. Kitchen to be located in the southeast corner. Living room to be 12’x17’ in the northwest corner. Closets, fixtures, and appliances to be located as indicated on the sketch plan unless otherwise approved by City code officials. Assess HVAC, plumbing, and electrical requirements based on the building’s existing infrastructure. Determine the need for any structural reinforcement or layout changes. ● The contractor is responsible for obtaining all permits and scheduling inspections deemed necessary by the local authorities. This includes any 3rd party inspections and necessary document submission. ● All permits and inspection fees are to be paid by contractor. No work is to be performed without the necessary permits obtained. ● Project will require a building permit issued from the local building department and inspections as specified by the code officer. 2 Structural Frame and install interior walls, incorporating space for existing and new plumbing, electrical wiring, and sewer pipe. 3 Plumbing $ Install plumbing for kitchen and bathroom. Include connections for sinks, shower/tub, and toilet. Water shut off valves to be placed behind toilet, and under kitchen sink.