Specifications include, but are not limited to: The purpose of the project is to provide door access control and associated hardware at all exterior doors, to provide exterior and interior security cameras, and to provide lockdown system; Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Architect/Engineer, the work of their contract with the work by others. 1. Debris removal and daily and final cleaning up. 2. Site utilization and management so as not to disrupt the Owner’s ability to operate the existing facilities in a safe and efficient manner. 3. Product and equipment storage and handling requirements. 4. Site safety in accordance with all applicable federal, state, and local regulations. 5. Project submittals, meetings, testing services, work plans, schedules, shop drawings, closeout procedures and documents, manuals, as-built drawings, and final commissioning of the work shall be provided as required by the Contract. The Contractor is to maintain the entrance area clear of materials, vehicles and any other obstacle or debris.