Specifications include, but are not limited to: Supportive work for the implementation of new access control and shelter-in-place devices on a number of interior and exterior campus building doors as outlined in the bidding documents. - Making required modifications to existing doors, frames, and door hardware as indicated - Furnishing and installation of new doors and frames as indicated - Furnishing and installation of new walls and other indicated building elements as indicated - Furnishing and installation of door hardware as indicated (division 87100 specifications) - Furnishing and installing of new junction boxes above doors as indicated - Furnishing and install new conduits, pathways, and any other infrastructure items between the doors and new junction boxes above the doors (including pull-strings) - Furnishing and installation of all required conductors from electrified power transfer device to electrified door hardware - Furnish and install all new electrical devices and power as indicated in the documents - Restore adjacent surfaces impacted by demolition and construction work back to original condition (unless otherwise noted) as outlined on drawings and technical specifications