The consultant's scope of work will adhere to a structured approach, starting with a comprehensive assessment phase that includes consultations with stakeholders to evaluate their spatial requirements and functional needs. This phase will also feature a detailed analysis to determine the optimal use of space for future control center designs and programming. Following this, and based on the options discussed in Section 4.2, a conceptual design, reaching approximately 30% completion, will be developed and presented to stakeholders for review and feedback. Once an option is approved, the project will progress to the design development phase, where detailed architectural plans and specifications will be meticulously crafted. The final construction phase will implement the approved design, ensuring adherence to all relevant codes, standards, and regulations. This structured methodology ensures that stakeholder requirements are fully integrated into spatial programming and the final design, comprehensively addressing all their needs.