Specifications include, but are not limited to: The Dormitory Authority State of New York (DASNY) is seeking proposals from Construction Manager’s-at-Risk to provide Professional Construction Management-at-Risk services during the design and construction of Tower 3, 10-story dormitory with 212 beds on the campus of Buffalo State College. The project is to renovate all 10 floors and the basement, with LEED Silver Certification. The scope includes, but not limited to, removal and remediation of hazardous materials; removal and replacement of the majority of the mechanical, electrical and plumbing systems; access control system throughout the building; reconfiguration of the basement, including the addition of a fire pump room, emergency generator room, study room, public toilet, enlargement of the laundry room and updating of finishes; reconfiguration of the first floor including the addition of an accessible student bedroom with an accessible bathroom, entrance on the west of the building; air conditioning in the Resident Director (“RD”) Apartment and Office, enlargement of the student lounge through a small addition to the north and east, and removal and replacement of windows and storefront; floors 2-7, and 9 contain four student suites per floor with each suite containing three bedrooms, a suite lounge and a suite bathroom, the suite bathrooms will be completely renovated and reconfigured including new showers and shower enclosures, water closets, lav fixtures, lighting fixtures, wall and floor tile, mirrors and upgraded ventilation systems (one of the bathrooms will be configured to be accessible), the suite lounges and bedrooms will receive new finishes, the bedrooms will receive new wardrobes and all doors and door frames will be replaced; the 8th floor is a similar configuration to floors 2-7 and 9 except each suite contains a kitchenette which will be removed and the suite reconfigured to mimic floors 2-7 and 9; the 10th floor contains three suites and a student lounge with a public toilet, the work in the three suites will be the same as the suites on floors 2-7 and 9, the student lounge has a kitchenette which will be removed and replaced and the public toilet will be reconfigured to be accessible; all floors contain a core area containing two elevators (not part of this contract), lobby, two stairs, janitors closet and storage room, the lobby, stairs, janitors closet, and storage room will receive new doors and door frames and finishes; site work includes the removal and replacement of sidewalks, the removal and installation of areaways and the installation of bike racks and bike shelter.