Replacement of the existing bridge carrying William Floyd Parkway (CR-46) across Narrow Bay with a new high level fixed bridge built to the west of the existing bridge with a minimum 75-year service life. The existing bridge will be demolished after completion of new bridge. The new bridge will have 1- 11'-0" lane in each direction 2- 4'-0" wide shoulders and 1- 12'-0" wide protected shared use path. Work to also include park restoration, landscaping, traffic signal replacement, pavement markings, drainage improvements, curb ramp replacement to meet PROWAG and MUTCD Compliance, and waterfront access. Work to be performed from barge mounted equipment for deep water work and temporary work trestles for shallow water work. Temporary cofferdams will be utilized for pier foundation installation. The navigation channel and existing drawbridge will remain operational during new bridge construction.