Work shall include, but not be limited to the rehabilitation of Luiz F. Kahl Way roadway, including full depth reconstruction, mill and overlay as well as partial curb replacement of the at grade roadway, as well as the milling and overlay of pavement on the ramps and the deck of the elevated roadway at the departures access to the terminal building. The removal of debris and cleaning of drainage structures throughout the entire Buffalo Niagara International Airport public landside campus. Repair and replacement of roadway street lighting fixtures throughout the entire Buffalo Niagara International Airport public landside campus. Installation of updated signing and striping as detailed in the plans is also included as part of this contract. Pedestrian crossing beacons, including pedestrian activated cross walks lighting and curbing along Luiz F. Kahl Way near Genesee Street is included in this contract.