The Work of this project provides for the furnishing of all labor, materials, appliances, tools, equipment and plant, and the performing of all Work in accordance with these specifications and drawings: i. General Aviation Apron full depth asphalt pavement reconstruction. ii. Taxiway P & Q concrete rubblization and rehabilitation with an asphalt overlay pavement section. iii. Taxiway P & Q realignment and new full depth pavement sections for pavement expansions. iv. Taxiway P1 and P2 will be partially reconstructed to accommodate Taxiway P grade changes and pavement radius expansions. Geometry improvements to meet current FAA design standards. vi. Pavement and turf drainage improvements. vii. Demolish excess pavement areas with conversion to turf. viii. Stormwater collection system improvements. ix. Stormwater management and soil erosion control measures. x. Remove existing glycol collection pan inserts and construct new centralized glycol collection facility. xi. Replace airfield guidance signs and taxiway edge lights, including bases, cable and conduit. xii. Pavement markings and aircraft tie-downs.