The scope of work for this project includes but is not limited to the following key work items. 1. Provision of Project Plans (HASP, Demolition Plan, Waste Management Plan, Structure Protection Plan, Vibration Monitoring Plan, Air Monitoring Plan) and other submittals required by the Specifications. 2. Provision of Insurance Coverage, Bonding and all Permits. 3. Mobilization/Demobilization 4. Photographic Documentation 5. Provision of temporary controls (fencing, barriers, pedestrian and traffic controls, flagman, and sedimentation controls). 6. Providing temporary utilities to perform the work and protection of utilities to remain. 7. Verification and provision of utility terminations in coordination with public and private agencies and completion of all terminations in accordance with agency regulations. 8. Abatement of asbestos and universal wastes 9. Demolition of the building in its entirety 10. Removal of the slab and foundations 11. Disposal of all non-recyclable materials and wastes at a NYDEC permitted landfill. 12. Separation of recyclable materials and removal from the site and documentation of its disposition 13. Disposal of excess concrete and hard materials at an approved facility 14. Final grading of backfilled areas 15. Restoration of sidewalks 16. Provision of backfill and compaction as defined on the Project Drawings. 17. Removal of temporary controls