Specifications include, but are not limited to: The work was partially completed and is now being rebid in its current condition with additional storm water scope. This reissued for bid scope of work provides guidance for completion of remaining work in the original project design, plus the new stormwater work after project suspension. Project Description: The project will develop a 3-1/2-acre parcel into two parking Lots. Parking lot one will be developed into a 100 parking space multipurpose lot serving both airport and NFTA Metro patrons by providing a parking lot that offers: • Park & Ride • Cell Phone Waiting • TNC Waiting Area (Lyft/Uber) • Metro Bus Stop Parking lot two will be developed into a 297 parking space Airport Employee lot. This lot will be secured by access-controlled barrier arms and monitored by video surveillance. The lot will include two waiting shelters. Note: Final parking space counts may vary based on constraints identified during design and construction.