Project Estimate: $284,000
Project Summary: The scope of the work consists of removal of south playground and construction of a new concession building with split-face block walls, metal roof and soffit, and painted metal doors. The interior of the building includes: toilet rooms for men and women; concession space with a rolling stainless steel shutter and counter; a storage room for tennis court equipment; mechanical space that has a backflow preventer and mop sink. Limited areas of asphalt sidewalks will be replaced and in some locations widened to accommodate service vehicles. Metal bollards will be located to deter usage by general traffic. A concrete sidewalk will be installed on all four sides of the building for access. Limited areas of asphalt and curb are to be replaced within the right of way to allow installation of utilities.
Spec Deposit: $50
Mailing Fee: $10
Bid documents for public works contracts are currently not available on BidNet. They may be viewed or purchased in person from the City of Rochester, Bureau of Purchasing. Or you can send your request along with deposit and mailing fee to the address below. If you would like them sent to you by FedEx, please include your FedEx # in your request and the mailing fee will be waived.
City of Rochester, Bureau of Purchasing
City Hall, Room 105-A
30 Church Street
Rochester, NY 14614
To view the City of Rochester's Current Plan Holders List for this project, please go to the Communication tab above.
This Contract Contains and Incentive Program for Employing Qualified City Residents
This Contract Contains M/WBE and Apprenticeship Training Requirements
This Contract Contains New Requirements for NY State Wicks Law
This Project is Funded by a Federal Community Development Block Grant and Certain Federal Requirements Apply