The Work to be performed under this contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and furnishing all labor, transportation, and services, including: fuel, power, water, and essential communications, and performing all work, or other operations required for the fulfillment of the contract. the work of this contract comprises of the following: Demolition of the existing 250,000 gallon steel water storage tank. Construction of a new 250,000 gallon welded steel water tank, including site work, tank coating system, cathodic system, instrumentation, electrical distribution, and associated pipe and control valves. Existing SCADA to be modified to communicate with the new water tank.