Specifications include, but are not limited to: e heavy renovation of approx. 450 sf of heavy renovation in the existing space with an additional approx. 200 sf expansion into the adjacent elevator lobby area. Additionally, there will be the reconfiguration of existing space outside the clean rooms consisting of approx. 600 sf of medium renovation for workstations and storage to provide better access, communication, efficiency and flexibility. Includes adjacent office and provide space saver storage shelving ; 1. Framing / Drywall 2. Insulation / Moisture Protection 3. Painting 4. Flooring 5. Glazing / Doors 6. Roofing 7. Casework 8. Mechanical 9. Electrical 10. Plumbing / Controls 11. Fire Protection 12. Special Systems .