Specifications include, but are not limited to: Construction of the Pueblo de San Ildefonso Wastewater System Improvements Phase I. This project consists of the rehabilitation of existing 6-inch, 8-inch and 10-inch VCP sewer with 9,489 linear feet (LF) of 8-inch and 10-inch HDPE DR 17 by pipe bursting, rehabilitation of existing 6-inch and 8- inch VCP sewer with 878 LF of cured in place pipe (CIPP), installation of 1,502 LF of 8-inch PVC SDR35 gravity sewer line, demolition and reconstruction of 26 existing manholes, installation of 9 new manholes, rehabilitation of 5 existing manholes with protective liner and coating, coating of 5 existing manholes and abandonment of 4 existing manholes, reconnection of 88 existing service lines to new and rehabilitated sewer line, and CCTV inspection of all new sewer lines. The project also includes one additive bid alternate consisting of approximately 516 LF of 12" PVC C900 waterline, three gate valves, and appurtenances in the same utility corridor as the proposed Povi Kaa sewer line.