Specifications include, but are not limited to: This scope of services provides a description of work to be provided by the consultant to the City of Farmington (City) to study, recommend improvements and provide cost estimates for the City’s water treatment plants WTP #1 and WTP#2 to reliably produce 20 million-gallon-per-day (mgd) and 10 mgd drinking water respectively, for the next 20 years, and how WTP#2 capacity could be expanded in the future as demands increase over the next 20 years. Services may include, but not be limited to basic architectural/engineering services for design development, construction documents, bid assistance, construction administration, project close-out and twelve (12) month warranty inspection. This project will be developed under three (3) phases. Each phase will be subject to a separate notice to proceed. The City may, at sole discretion, determine to complete each phase under the contract resulting from this RFQP, or complete each phase under a separate solicitation. If any phase after the first phase will be implemented under the existing contract, a change order to the contract to detail the cost and scope of services will be process after agreed to by both parties in writing.