Specifications include, but are not limited to: 1. Construct approximately 21,160 feet of 24-inch, and 630 feet of 12-inch waterlines with associated shutoff valves, air release/vacuum valve stations, and appurtenances. 2. Construct one (1) jack and bore / trench casing crossing under State Road NM200 for 24-inch waterline. 3. Construct one (1) jack and bore crossing under Railroad for 24-inch waterline. 4. Construct eleven (11) jack and bore / auger and bore crossings under numerous existing utilities for 24-inch waterline. 5. Construct one (1) jack and bore / auger and bore crossing under numerous existing utilities for 12-inch waterline. 6. Construct the water transmission line facilities within State Land easements, Federal Land (Bureau of Land Management) easements, and private land easements. 7. Construct all work with full compliance of Permit Requirements from the New Mexico Department of Transportation, the United States Department of Interior – Bureau of Land Management, and BNSF Railroad Company. 8. Construct Chlorination Building (approximately 1,040 square feet) including building, chlorine loading and feed system, chlorination system, electrical, and instrumentation with SCADA system. 9. Construct 5-million gallon ground storage reservoir (prestressed concrete) including site development, piping, and flow meter structures. 10. Construct Water Booster Pump Station (approximately 168 square feet) including building, booster pumps, piping, electrical, and instrumentation with SCADA system, and site work. Additive Alternate “A”: 1. Construct approximately 9,650 feet of 16-inch waterline with associated shutoff valves, air release / vacuum valve stations, and appurtenances. 2. Construct two (2) jack and bore / auger and bore crossings under numerous existing utilities for 16-inch water line. 3. Construct one (1) trench casing crossing over existing utility for 16-inch waterline. 4. Construct the water transmission line facilities within State land easements, Federal land (Bureau of Land Management) easements, and private land easements. 5. Construct all work with full compliance of Permit Requirements from the United States Department of Interior – Bureau of Land Management. C. Additive Alternate “B”: 1. Construct 20 feet of 16-inch waterline extension with shutoff valve, fittings, and thrust block at end of pipe.