Specifications include, but are not limited to: Type of Work: Multi use path design and determine the type and design of a mid block crossing. Posted Route: US 180 Limits: MP 120.0 to MP 122.5 Total Length: 2.5 miles NMDOT District: 1 County: Grant Functional Classification: Principle Rural Arterial Terrain Type: Rolling Construction Programmed Year: 2020 Anticipated Letting Date: June, 2019 Project Development Engineer: Arthur J. Romero Urban or Rural: Rural. This work involves performing an environmental investigation in accordance with the edition of the NMDOT Location Study Procedures, FHWA Technical Advisory T 6640.8A, 23 CFR Part 771 and other applicable guidelines and regulations. Environmental investigations must include analyses of all issues mandated by the National Environmental Policy Act (NEPA) as well as other state and federal environmental legislation, including Executive Orders on Wetlands, Floodplains, and Environmental Justice.