The work includes concrete sidewalk 6” (colored), earthwork, erosion control, rock gravity walls, one prefabricated steel truss bridge including drilled shaft foundations, seeding, and trail signs. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with the construction plans and specifications. The bids shall be in the form of unit pricing as per items listed on the bid sheets. The bid shall include all permits, fees, tie-in fees for all utilities, overhead and profit and incidental costs in the bid amounts. All applicable taxes shall not be included in the bid amounts. All applicable laws and ordinances and the rules and regulations of all authorities having jurisdiction over the project shall apply to the contractor and all agreements between the contractor and the County. LOCATION AND DESCRIPTION OF WORK: The Arroyo Hondo Segment 2 & 3 project will include the following work: Segment #2 – Construction of a 1.2-mile-long concrete multi-use trail connecting the existing Rancho Viejo Fire Station Trailhead to the Turquoise Trail Sports Park off of NM 14 and Segment #3 – constructing 1.6-mile-long concrete multi-use trail from connection with existing trail NW of Rancho Viejo Fire Station to Richards Avenue and extensions to Avenida Del Sur and Velocity Road roundabouts. Installation of a pre-fabricated steel truss bridge including drilled shaft foundations (Segment 2). The project is funded by the Federal Highway Administration (FHWA)/CMAQ Funds and matching local funds. Therefore, contractors must ensure that all work performed meets standards as set forth in the current NMDOT Standard Specifications for Highway and Bridge Construction (NMDOT Standard Specifications), including Supplemental Specifications. Additionally, all projects with federal funds shall utilize the Technician Training Certification Program (TTCP) certification or pre-approved alternatives in regards to testing/inspection to comply with NMDOT specifications. Davis Bacon Act (DBA) Conformance Requirements will be in effect for this project. Materials in this project are subject to “Buy America Requirements,” which mandate the contractor to provide materials that comply with the requirements in 23 CFR 635.410, including Build America, Buy America Act. If these certifications are not provided, the NMDOT may take any remedies available under the Contract. Products used on New Mexico Department of Transportation (“NMDOT”) Projects must be approved by the NMDOT’s product evaluation program and listed on the NMDOT’s approved products list (“APL”). The Contractor and Subcontractors at all tiers Working on federal-aid Projects shall use the following Software Programs to report specific EEO, Labor Compliance and DBE information as required by the Contract and as specified by this NTC. The two software programs are: • B2GNow software • LCPtracker software Use of B2GNow and LCPtracker software programs is required and shall be considered Incidental. Failure of a Contractor or Subcontractor to use the required software programs to report specific EEO, Labor Compliance and DBE information may result in the issuance of a Non-Conformance per Standard Specification Section – 109.8.2 “Non-Conformance” or other Contract remedies.