Specifications include, but are not limited to: Intercepting and bypassing sections of sanitary sewer main from 500 -1000 gpm, including the installation of temporary piping up to 1000 ft (8-12 inch); 2) Intercepting and bypassing sections of sanitary sewer main from 1000 to 1500 gpm, including the installation of temporary piping up to 1000 ft (12-18 inch); 3) Bypassing of Lift stations (0-500 gpm), including the installation of a temporary suction line and discharge forcemain up to 1000 ft; 4) Bypassing of Lift stations (500-1000 gpm), including the installation of a temporary suction line and discharge forcemain up to 1000 ft; 5) Bypassing of Lift stations (1000-1500 gpm), including the installation of a temporary suction line and discharge forcemain up to 1000 ft; and 6) Bypassing of Lift stations (1500-2000 gpm), including the installation of a temporary suction line and discharge forcemain up to 1000 ft.