Specifications include, but are not limited to: The Town of Vaughn is seeking proposals for the removal of demolition debris pile and all Associated materials, Including a concrete slab, foundation, and other materials adhered-to, or Adjacent-to, the slab and foundation. The materials shall be transported to a recently-permitted Asbestos Special Waste Landfill in Vaughn. The debris pile is a result of building demolition. The building contained asbestos materials that were not removed prior to, or after, the demolition. The building contained asbestos mixed throughout the demolition debris. RFPs will be accepted until November 9th at 1:00PM The debris pile is roughly cone-shaped, 100 feet (ft) in diameter and about 10 feet (ft) tall at the Highest point.