1 General Conditions 1 LS $ 2 Civil yard work, paving, grading, trenching, yard piping, retaining wall, and restoration 1 LS $ 3 Demolition of existing clarifier equipment 1 LS $ 4 Flocculation and sedimentation basin concrete work 1 LS $ 5 Flocculators, flocculator motors, and associated accessories, not including VFDs (materials and shipping only) 1 LS $ 6 Plate settler system (materials and shipping only) 1 LS $ 7 Residuals collectors, cable drives, vendor control panel, air bubblers, and associated accessories (materials and shipping only) 1 LS $ 8 Installation of flocculator equipment 1 LS $ 9 Installation of plate settler equipment 1 LS $ 10 Installation of residuals collector equipment 1 LS $ 11 Field applied high-performance coatings 1 LS $ 12 Process piping, valves, gates, and actuators (not including yard piping) 1 LS $ 13 MCC building excavation, grade preparation, structural, architectural, and HVAC (not including electrical, instrumentation, controls, or security) 1 LS $ 14 Electrical equipment and installation (including flocculator VFDs) 1 LS $ 15 Instrumentation, controls, and security equipment and installation 1 LS $ 16 Remainder of the Work 1 LS $