A. COORDINATE FINAL LOCATION OF ALL DEVICES WITH OWNER AND ARCHITECT WITH RESPECT TO MOUNTING HEIGHTS AND LOCATION OF EQUIPMENT, FURNITURE AND WALL FURNISHINGS. COORDINATE FINAL LOCATION SO AS NOT TO INTERFERE WITH FURNISHING OR WALL MOUNTED ITEMS. B. COORDINATE LOCATION OF ALL MECHANICAL, PLUMBING AND FIRE PROTECTION EQUIPMENT WITH THEIR TRADE DRAWINGS AND INSTALLING CONTRACTOR. C. COORDINATE ALL ROOF PENETRATIONS WITH MECHANICAL AND ARCHITECTURAL DETAILS. D. COORDINATE ALL WIRING, CONNECTIONS AND CONTROLS FOR MECHANICAL EQUIPMENT WITH MECHANICAL CONTRACTOR. COORDINATE LOCATION AND INSTALLATION OF CONTROL DEVICES. E. EACH BRANCH CIRCUIT IS TO HAVE ITS OWN NEUTRAL WIRE AND IS NOT TO SHARE A NEUTRAL WITH OTHER CIRCUITS. F. ALL ELECTRICAL WIRING DEVICES ARE TO BE RECESSED (FLUSH MOUNTED) UNLESS NOTED OTHERWISE OR OTHERWISE DIRECTED BY OWNER. G. NOTE THAT THE IDENTIFICATION LABELS TO BE USED/MADE FOR ALL SYSTEM MUST USE THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMES PRIOR TO LABELING AND PROGRAMMING SYSTEMS. H. ALL FINAL ELECTRICAL PANEL SCHEDULES ARE TO BE UPDATED AND CONFORM TO THE OWNER'S ROOM NUMBERS AND ROOM NAMES, NOT THE NUMBERS OR NAMES ON THE CONSTRUCTION DOCUMENTS. MEET WITH OWNER TO REVIEW AND CONFIRM ROOM NUMBERS AND NAMES PRIOR TO GENERATING FINAL PANEL SCHEDULES.