1. Obtain permits designated to be obtained by Contractor and comply with the terms of all permits issued for the project. 2. Install and maintain temporary diversion of surface water, including stormwater runoff control, diversion of spillway discharge from isolated work areas, and unwatering of portions of the stilling basin. 3. Install, maintain and remove dewatering measures. 4. Install, maintain and remove temporary erosion and sediment controls. 5. Provide temporary field offices during construction. 6. Site preparation including clearing and grubbing and regrading to create temporary construction access and contractor laydown and staging areas. 7. Demolition of existing structures to be removed. 8. Excavation, fill, riprap, screening of existing site materials, temporary stockpiling, and off-site spoil. 9. Foundation cleanup and preparation. 10. Furnish and install subdrain system. 11. Furnish and install cast-in-place concrete and mass concrete. 12. Furnish and install RCC embankment armoring, including test section. 13. Protection, modification, and installation of Instrumentation. 14. Construction of the fish screen. 15. Install simulated desert varnish (RCC Surface Treatment) on RCC as determined by the Owner. 16. Miscellaneous site improvements, such as fencing and gates. 17. Site restoration.