Specifications include, but are not limited to: The Consultant to be engaged shall be expected to perform all the work necessary to provide for the proper Construction Monitoring and Inspection Services for the Walt Whitman Bridge Suspended Span Link Replacement – Phase II, Contract No. WW-34-2023. The Consultant will provide all on-site and off-site project inspection and observation required to certify that all materials and workmanship for this Project are completed in conformance with the Construction Contract’s requirements and industry standards. The Consultant must be capable of responding to the needs of the DRPA with personnel possessing expertise in the work specified. This expertise must exist within the firm or within the proposed Project team and must be readily available to the DRPA as needed. The scope of the construction work to be completed under Contract No. WW-34-2023 includes replacement of four (4) tower pin and link assemblies, rehabilitation of four (4) tower wind restraint assemblies, and replacement of various gusset plates and steel members on the Walt Whitman Bridge.