The objective of this project is to reduce the energy consumption of the Island Beach State Park Police Substation by upgrading and installing a heating, ventilation and air conditioning (HVAC) system and adding a water heating system to the building. The project also includes relocating and improving the building’s electrical panel to support energy efficient equipment and units. The building’s electrical panel will be relocated to the building’s main floor. The electrical, mechanical, and related distribution equipment in the basement/crawlspace and building will be removed and disposed along with repairs made to the building from equipment removal. A stand-by generator will be installed to back-up power for the building.