Specifications include, but are not limited to: Roadway, sanitary sewer, storm drainage, and pedestrian improvements on Linden Lane between Nassau Street and Henry Avenue; the entire length of Spruce Street; and Maple Street from Spruce Street to the northern end. The principal items of work consist of the following: 4,085 CY of excavation, unclassified; 11,595 CY of dense graded aggregate base course; 4,605 tons of HMA 19M64 base course; 1,460 tons of HMA 9.5M64 surface course; 655 LF of reinforced concrete storm pipe (12", 15, and 18" diameter); 406 LF of PVC storm pipe (4" and 8" diameter); 34 units of inlet or manhole repairs; 2 units of inlet or manhole reconstruction; 4,870 LF of sanitary sewer pipe lining; 1,151 LF of 8" diameter PVC sanitary sewer pipe replacement; 4,517 LF of sanitary sewer pipe lateral replacement; 3,264 SY of concrete sidewalk, ADA curb ramps, and driveway aprons; 2,247 LF of concrete vertical curb; 560 SY of hot mix asphalt driveway reconstruction; 200 LF of granite curb resetting; traffic markings including 2,120 LF of 4" traffic marking lines and 1,354 LF of 24" traffic marking lines; permanent signage; 16 units of tree removal (12" to over 36" diameter); and other related miscellaneous work