The removal and replacement of certain sections of deteriorated concrete curb, replacing sections of concrete sidewalk in disrepair, installation of concrete sidewalk in certain areas where none currently exists, installation of ADA accessible curb ramps, upgrading existing ADA accessible curb ramps to current standards, cleaning and/or repairs of existing drainage inlets, installation of circular rapid flashing beacons and associated pedestrian crossings, milling of the existing pavement surface, base course repairs as needed by visual inspection of the milled surface, a 2-inch pavement course overlay and striping of the roadway as well as all other Work of any type or description necessary for contemplation of the Project.