The objective of this project is to construct thirty (30) dual port level 2 charging stations serving a total of sixty (60) parking spaces at the Trenton Office Complex Garage at 225 East State Street in Trenton. Equipment lead times, such as transformers and panel boards, are expected to be 12 to 15 months. Construction phase duration to be adjusted accordingly dependent upon equipment lead times. The Trenton Office Complex Garage has approximately 1265 parking spaces. The 30 dual port level 2 charging stations will be added on level 4. The Consultant shall be responsible for the following: Coordination with utility company for new services as required. Load calculations for use in designing load center, switchgear, distribution equipment etc. Pedestal details to support charging stations. Restriping of parking spaces as necessary. Appropriate signage indicating EV charging spaces. Restoration details.