Specifications include, but are not limited to: The project involves furnishing, constructing and testing a corrosion control chemical feed system that doses zinc orthophosphate into the Trenton Water Works’ water supply at the Central Pumping Station. The existing chemical tanks from the Reservoir Gatehouse shall be transported by the Contractor to the Central Pumping Station to be repurposed for the zinc orthophosphate system. All other equipment, instruments and materials shall be new and supplied by the Contractor. The project includes installation of a chemical feed system, instrumentation, a concrete containment wall, a fill station and fill piping, electrical wiring, conduit and controls, eyewash/showers and water heaters, programming of controls, development of new HMI screens and all incidental work for a complete and operable system. The new chemical feed system system shall be installed an operating within 120 days from notice to proceed.