The construction project consists of upgrading the existing Wastewater Treatment Plant’s existing Raw Influent Pump Station and Sand Filter System. The scope of work required under the Contract shall consist of, but is not limited to, the following: Raw Influent Pump Station • Installation, operation, and removal of a bypass pumping system, including provisions for temporary power. • Cleaning and removing sludge from the station’s wet well. • Epoxy coating system for the station’s wet well. • Demolition of existing pumping units, piping, valves, structural supports, controls, HVAC, and electrical within the station’s dry well and wet well areas. • Installation of new dry well submersible pumps with variable frequency drives, piping, valves, structural supports, controls, HVAC, and electrical within the station’s dry well and wet well areas. • Installation of a motorized hoist system. • Concrete repairs and painting. • Installation of a new gas detection system. • Installation of new sump pumps and controls within the station’s dry well area. • Equipment and system testing.