Specifications include, but are not limited to: 1. General: The Consultant shall provide the Design, Construction Administration, Permitting and Bid/Award Services for the demolition, removal and complete replacement of the storage tanks located at the wastewater treatment plant at Bayside State Prison. 2. Demolition: The Consultant shall evaluate and determine any necessary decommissioning required for the safe removal of the existing tanks. The Consultant shall provide the design for capping and/or the safe removal of any associated piping or hosing. The Consultant shall provide the design for the demolition and removal of the existing concrete pad for the equipment. 3. New Sludge Storage Tanks: The Consultant shall provide the design for the replacement of the existing sludge storage tanks. The new equipment shall be of similar kind and existing footprint. The Consultant shall evaluate and provide the design and specifications for any site condition improvements. The design documentation shall include any necessary structural specifications for the reinforcement and/or bolting of the new equipment. The Consultant shall include in the documentation the design and calculations for the new concrete slab. Any replaced piping, hosing or related components to the new equipment shall be included in the design. The Consultant shall evaluate and provide the design for any required electrical service and/or necessary upgrades. 4. Pump & Controls: The Consultant shall evaluate, determine and provide the design to upgrade or replace any necessary controls and control related equipment. Training and usage of any new controls shall be included in the design documents. 5. Signage: The Consultant shall include in the design documents any new or missing signage. 6. Construction Site: Determine the need and approved locations for vehicle parking, construction equipment, cranes, material storage, dumpsters, safety barriers. All security fencing is required around the construction site or elements of the site such as storage trailers, construction materials, buildings, equipment and shall be identified on the design drawings where appropriate. Develop procedures for personnel to access the project site and construction Include in the design documents that the site must be restored to pre-construction conditions after construction has been completed and approved. 7. Construction Phasing: The Consultant shall provide the design and schedule to accommodate one sludge storage tank out-of-service during construction and installation. Provisions for switch over issues shall be addressed in the design documents and all construction activities that will require special phasing shall be shown in the construction schedule provided in the specification. The Consultant must assure that the existing wastewater treatment plant equipment and operation will not be altered or shutdown during the construction and installation of the new equipment.