I. SCOPE OF WORK & RESPONSIBILITIES A. Installation Methods and Compliance 1. All work shall be done in accordance with applicable standards including, but not limited to, the American National Standards Institute (ANSI) and the National Fire Protection Association (NFPA). B. The contractor is expected to furnish, at no additional cost to Rowan, tools and equipment normally associated with the trade, including but not limited to: 1. Tools necessary to fully install any security equipment, including, but not limited to, the following vendors - STiD, Allegion, Axis, Bosch, Honeywell, Mercury C. The contractor is expected to own or have immediate access to required tools and heavy equipment for installation of physical security equipment including at a minimum: 1. One Bucket Truck with minimum boom height of 42’ D. The Contractor shall be required to submit a list of all company owned heavy equipment. E. When required by Rowan University the awarded contractor shall install any security related electronic equipment related to the project including strikes, exit devices, alarm panels, door and other contacts, panic buttons, wireless controller gateways, mag strikes, cameras, etc. This installation shall be decided by the University. F. When required by the University, all pathways including but not limited to hooks, straps, cable tray and conduit shall be installed for the purpose of installing access control low voltage cables. All category 6, 6a, 7 and other cables for cameras and other ethernet enabled devices shall be installed by other contractors at the convenience of the University. G. Annual On-Site Support and Service Agreement (yearly SLA): The selected vendor must provide comprehensive, ongoing maintenance and support services to ensure the reliability, security, and optimal performance of Rowan University's electronic access control, surveillance, and alarm systems across all campuses.