1 Milling 2 inch 30,900 SY 2 Hot Mix Asphalt 9.5M64 Surface Course, 2” Depth 4,000 TON 3 Hot Mix Asphalt 19M64 Surface Course, 4” Depth 5 SY 4 DGA 6” Depth 5 SY 5 Raise Sanitary Manholes 30 EA 6 Reset water valve box 36 EA 7 Reset gas valve box 21 EA 8 Reset B Inlet with new N eco head 13 EA 9 Reset B Inlet With New Bicycle Safe Grate 11 EA 10 Traffic Markings Long Life Thermoplastic, White, 2’ Crosswalk 837 LF 11 Traffic Markings Long Life Thermoplastic, White, 2’ Wide Stop bar 288 LF 12 Traffic Markings Long Life Thermoplastic, Blue Symbol 4 EA 13 Traffic Markings Long Life Thermoplastic, Blue, 4”, Wide Line 80 LF 14 Relocate Street Sign 4 EA 15 Construct Concrete Handicap Curb Ramps 446 SY 16 Remove Concrete Slab 42 SY 17 Install Truncated Domes 30 EA 18 Construct Concrete Curb and Gutter 740 LF 19 Construct Belgium Block Curb 10 LF 20 Construct Concrete Curb 1,725 LF 21 Asphalt Price Adjustment 0 TON 22 Traffic Control 100 MH