In line with N.J.A.C. 7:27 and the New Jersey Department of Environmental Protection, Facility Specific Requirements for each permitted location, it is the intent of the Trenton Water Works to have monthly operational no load test inspections of the emergency generator for both the Ewing Booster Station and the Klockner Booster Station performed toward the beginning of each Calendar Month on an Air Quality Index day of <100. Documentation for each location and month shall be included in the vendors report and legibly printed on all necessary Emergency Generator Operating Logs for the Trenton Water Works specific to each Pump Station while complying with all parameters indicated on the forms. That documentation shall include but not be limited to static engine checks, engine run tests, engine gauge readings, static generator checks, generator engine running tests, generator meter readings, any notes of pertinent conditions or defects, Hobbs meter readings at start and end, start time, end time and date and day of operation...