Specifications include, but are not limited to:All existing access control systems are model Readykey as manufactured by Radionics. 2. Most existing security alarm system controls and/or DACT’s are models D9112 and D9412 as manufactured by Bosch/Radionics. 3. All Security Alarm systems, Access Control Systems and Panic Alarm systems communicate to a County owned and operated model 6500 Digital Receiver as manufactured by Radionics, which is located in the Communications building and interfaced with an ABM central station software program. The bidder will be required to participate in all programming and testing requirements relating to the various Security Systems and their communication with the 6500 receiver. 4. The County intends to maintain consistency regarding the continued use of the aforementioned Radionic equipment for their Security Alarm Systems, Access Control Systems, Panic Alarm Systems, DACT’s and Digital Receiver. 5. The County intends to maintain consistency regarding the extensive use of programmed functions available from the Radionics operating software. Programmed functions shall include but are not limited to graphic display software for each access control system, point identification of each individual device contained in each security alarm system-panic alarm system, specific user identification with authority levels for all users of the access control system-security alarm systems along with any other programming requirements of the County. 6. Successful Contractor shall report to the Buildings & Grounds department designee all work performed at/to the Central Station Fire/First Aid desk computer at the new 911 Communications Building #96. 7. Power requirements exceed 30 volts throughout many areas of the Security Systems. As a result, the bidder or their full time employee must hold a valid New Jersey Electrical License. 8. Prior to the installation of new and/or modified Security Systems, the successful bidder will be required to develop and submit for approval to the Superintendent of Buildings & Grounds, multiple copies of equipment submittals, equipment wiring diagrams of the actual installation on CAD and floor plans showing equipment locations on CAD