Specifications include, but are not limited to: The work to be performed includes the furnishing of all labor, materials, and equipment necessary to complete the work as shown on the drawings and described in the specifications. The work in this contract includes, as a Base Bid, the renovation of the main pool (250,000 gal) which entails constructing repairs to portions of the concrete walls, new plaster and tiling, and resurfacing of the walk-in steps. An alternate bid consists of a complete reconstruction of the pool within the current footprint. The reconstructed pool option includes the construction of a zero-entry area with spray features, installation of new diving boards and resetting of existing slide equipment. Both the Base Bid and the Alternate Bid include constructing depth markers, racing lanes, end wall targets, waterline, acuity lines, and warning line within the pool footprint. Work also includes furnishing and installing racing lane dividers, divider reel, safety rope, rails, winter cover, handicapped lift, lifeguard chairs, backstroke flags and stations; and start-up and balancing of the operating systems and other incidental work for a fully-functioning facility.