1. Demolition - wood frame subfloor and orchestra pit, skylights, skylight curbs, existing CMU partitions. 2. Structural - infill orchestra pit, construct reinforced floor slab, infill skylights, repair/reinforce cracked tectum panel, replacement of roof curb, support roof steel for lighting truss, curtain package and sound equipment. Steel work for curtain support from proscenium beam and CMU wall. 3.Offstage- buildout, framing, sheetrock, ceiling, finishes, furniture, fixtures & equipment. 4. ADA restrooms, ADA wheelchair lift, material/equipment lift. 5. Provide curtain package as denoted in plans and specifications. 6. Demolish and replace ductwork. 7. Electric - Demolish existing temporary power and lighting. Construct new distribution and circuiting, lifts, exhaust fans and receptacles. Install new lighting fixtures complete. Extend power supply from existing. 8. Fire protection - Install new fire alarm devices, sprinkler heads, piping, etc. Extend Fire protection main. 9. Plumbing - Construct two bathrooms with showers and one restroom without a shower. Install new fixtures. 10. Provide furnishings.