The general description of work consists of the construction of approximately the following quantities: Soil Erosion and Sediment Control, 1 LS; Clearing Site, 1 LS; Excavation, Unclassified, 218 CY; HMA 9.5M64 Surface Course, 2” Thick, 82 TON; HMA 19M64 Base Course, 3” Thick, 123 TON; Dense Graded Aggregate Base Course, 6” Thick, 715 SY; Tack Coat, 36 GAL; Black Vinyl Chain-Link Fence, 4’ High, 96 LF; Black Vinyl Chain-Link Fence, 8’ High, 312 LF; Single Gate, 4’ Wide, Black Vinyl Chain-Link Fence, 8’ High, 1 UNIT; Double Swing Gate, 4’ Wide, Black Vinyl Chain-Link Fence, 8’ High, 1 UNIT; Porous Asphalt Trail, 8’ Wide, 8” Thick, 64 SY; Pickleball Courts Striping, 1 LS; Pickleball Court Surface (Acrylic), 712 SY; Pickleball Netting System, 3 UNIT; Site Restoration (Including Topsoiling and Seeding), 306 SY.