The Successful Qualified Firm will be required to provide a range of professional engineering services to undertake this assignment. The following list identifies some of the services required for this assignment: • Coordinate with the Authority and the Pennsylvania Turnpike Commission’s Delaware River Bridge Project, Stage 3 • Prepare and update design schedules and status spreadsheets • Prepare final contract documents including plans, specifications, and construction cost estimates • Prepare necessary Utility Orders and Utility Work Orders • Prepare right-of-way documents for properties to be acquired, if required. • Adhere to environmental regulations and conditions determined by the regulatory agencies • Coordinating & preparing permit application documents, as required. • Perform aerial mapping and develop a Survey Control Report • Established mainline, and PHMTE, existing best fit center line • Developed an Initially Preferred Alternative for each grade-separated U-Turn location, which is intended to be progressed to final design • Prepared an Environmental Screening/Limited Preliminary Assessment • Prepare a Preliminary Environmental and Land Use Constraints Report • Developed preliminary roadway plans and profiles for each grade-separated U-Turn Location • Perform Wetlands Delineation (Location Nos. 1, 2 and 3, as required)