Liberty Towers (80-unit elderly high-rise property: 1) The contractor will be required to furnish all labor materials and necessary to professionally replace the flooring in units as specified by the Housing Authority at turnover tenants moving out of the building). (upon 2) The contractor will be required to prepare all the floors, remove existing carpet, remove, and replace all vinyl cove base and replace carpet with the specified flooring. This shall include leveling and removal of all debris. damage 3) Protect other from installation surfaces, counters, light fixtures, etc.of items, or materials flooring (cabinets, against fixtures, 4) Flooring Specification-equal to “TrafficMaster-GripStrip Flooring, 25-year warranty, 6" by 36" planks, oak color (Home Depot). The contractor may substitute an equal product with the approval of the Housing Authority.