A. The purpose of this section is to clarify, but not in any way limit or intend to limit the scope of work shown in the Contract Documents. The enumeration of the following items shall in no way be construed to exclude other items of work, or areas of responsibility, which are called for in the Contract Documents. B. The project described herein consists of the buildings and/or ancillary structures as listed in the Contract Documents. In addition to the building and/or ancillary structures, it is expected that some buildings and/or ancillary structures will have additional physical features such as driveways, sidewalks, sheds, etc. which will also need to be removed. C. The objective of this scope of work is to demolish and remove all building materials related to each lot as well as all physical features identified on the individual lots in the Contract Documents. Each building and/or ancillary structure will also be restored by backfilling any basement holes, utility trenches, tree root holes, foundations, etc. to grade, and restoring with topsoil, seeding and hay mulch, or a DGA/RCA/crushed stone surface. Only clean fill in accordance with the specifications, and NJDEP Residential Direct Contact Soil Remediation Standards shall be imported for backfill to establish permanent stabilization for each site. It will be the Contractor’s responsibility to provide and maintain all appropriate Soil Erosion and Sediment Control measures per the Mercer County Soil Conservation District.