This involves the replacement or repair of roofing systems for the Plant's North and South Wings, as well as the Mechanical Dewatering Building (MDB), alongside the necessary replacement or repair of HVAC systems at these locations. Implementing these upgrades is crucial to eliminate the significant risks currently posed by leaking roofs and deteriorating building infrastructure, which compromise critical equipment functionality and staff safety. Ultimately, these improvements are vital for restoring the facility to a state of good repair, improving operational efficiencies, and significantly enhancing the security and resilience of WTC, which preliminary assessments indicate are currently high in vulnerability and low in resiliency.