The project work generally consists of tree removal, roadway and utility excavation, installation of sewer piping, manholes, laterals, cleanouts, force main piping, grading and profiling and access road at the end of Carrigan Lane, installation of perimeter fencing and gates, granite block curb installation, dense aggregate base course installation, partial full depth pavement re-construction, installation of base course and surface course layers of hot mix asphalt pavement. In addition, installation of electrical control equipment for the pump station, that is furnished by the Borough of Florham Park, and coordination with the Borough's Pump Station Control System Provider; and other incidental work all in the Borough of Florham Park in accordance with the form of proposal, contract and specifications prepared by the Borough's Engineering Consultant, Greenman-Pedersen, Inc.