In general, the work on this project consists of the removal and replacement of approximately 8,800 L.F. of ACP Sanitary Sewer main with 8,350 L.F. of 8” SDR-35 P.V.C., 500 L.F. 10” SDR-35 P.V.C., and 15 LF of 12” SDR-35 P.V.C. pipe. Work shall include removal of 32 manholes and installation of 36 new manholes, installation of 225 new sanitary sewer laterals, dewatering, temporary by-pass pumping systems, cured-in-place sanitary sewer main lining, manhole rehabilitation, and all other work required for the removal, replacement and rehabilitation of the sanitary sewer main. Work shall take place in the Beach Haven West section of Stafford Township on Beach Haven West Boulevard, Jeteemale Drive, Lawrence Drive, Patty Lane, Morton Drive. Also included in the scope of the Base Bid a will be the replacement of drainage catch basins, installation of 8” D.I.P. Pipe, 12” D.I.P. Pipe, 15” D.I.P. Pipe, and 18” D.I.P. drainage pipe and milling and repaving of the above-mentioned roadways from edge of pavement to edge of pavement.