Under Amendment 2, the following were changed:
1. Questions and answers document was updated. Answer to question #28 was revised.
Under this contract, the contractor will be responsible to provide all management, labor, tools, equipment and vehicles to operate, maintain and repair, the tertiary wastewater treatment facilities, eight lift stations, land application site, tactical training base septic system and the beneficial water reuse system. The equipment to be maintained and repaired includes, but is not limited to: force and gravity sewer mains, lift stations, basins, motors, conveyors, electrical components, instruments and gauges, and SCADA system. The contractor is also responsible for grass cutting and snow removal in all areas of direct control. Services are non-personal.